Second cogeneration plant of the Group, built inside Ariston Thermo Cerreto d’Esi factory. Operates in trigeneration mode with capacities of 530 kWe, 687 kWt and 300 kWf, producing electrical energy, heat and cold water entirely used within the factory.
-
Read more -
Read moreTorre San Patrizio plant
678,68 kWp peak power. Plant bought in 2018, built in 2011 with Isofoton panels and Santerno inverters.
-
Read moreGrottazzolina plant
934,56 kWp peak power. The first Novapower plant bought from third parties. Fourth Conto Energia, Vipiemme Solar 240-Wp panels, ABB inverters and European components.
-
Read moreGenga Cogeneration plant
600 kWp peak power. First cogeneration plant built inside Ariston Thermo Genga factory. Electrical and thermal capacity of 600 kWe and 683 kWt, produces electrical energy, steam and hot water entirely used within the factory.
-
Read moreSan Lorenzo Plant
811,44 kWp peak power. One of the two plants bought in 2017, built in 2010 with Atersa panels and SMA inverters.
-
Read moreEliosuasa Plant
999,00 kWp peak power. One of the two plants bought in 2017, built in 2011 with Mage Solar panels and ABB Power One inverters.
-
Read moreOsimo Plant
576 kWp peak power. Partially integrated with the rooftop, it is built on the rooftop of the largest Ariston Thermo wall hung boilers manufacturing plant. Started up in November 2009, it was the first Novapower Plant. Second Conto Energia. Solarfun...
-
Read moreGenga Plant
254,40 kW peak power. Partially integrated with the rooftop, of the largest electric water heaters manufacturing plant in the world. Second Conto Energia. Solarfun panels and Siemens inverter.
-
Read moreBorgo Tufico Plant
652,80 kW peak power. Built on the rooftop of one of Ariston Thermo’s Finished Products Warehouses. Second Conto Energia. Solarfun panels and Siemens inverter.
-
Read moreResana Plant
749,52 kW peak power. A Novapower Plant. Built on the roorftop of one of Ariston Thermo’s manufacturing plants. Started commercial operations in 2012. Fourth Conto Energia, Prime panels, and PowerOne line inverters. Its construction allowed the removal of asbestos from the...